dol wiring diagram

Your search returned the following results
BS 7671: 2008 (2015), the long awaited Amendment 3 to the 17th Edition of the IET Wiring Regulations, is now in force - effective from January 1st 2015. There will be a six month transition period where electrical contractors can install to Amendment 2 or Amendment 3, after which it will be a requirement that all electrical installations...
We want to hear from you! Complete the survey and you could WIN a Philips hue Starter Kit*!
Direct on Line IP65 Plastic Enclosure 400v up to 7.5kW* Smoothly styled modern IP65 enclosed DOL starter IEC947-4-1* Generous cabling space for easy installation* Combined contactor/overload assembly can be unclipped from DIN rail to ease installation* Support for 400v 3ph or 230v single phase* Overload supplied separately
Direct on Line IP65 Plastic Enclosure 400v up to 7.5kW* Smoothly styled modern IP65 enclosed DOL starter IEC947-4-1* Generous cabling space for easy installation* Combined contactor/overload assembly can be unclipped from DIN rail to ease installation* Support for 400v 3ph or 230v single phase* Overload supplied separately
Three Phase 400v up to 7.5kW with Isolator* Direct-On-Line Starter with isolator in plastic & metal enclosure IEC 947-4-1* Support for 400v 3ph or 230v single phase* Overload supplied separately
Three Phase 400v up to 7.5kW with Isolator* Direct-On-Line Starter with isolator in plastic & metal enclosure IEC 947-4-1* Support for 400v 3ph or 230v single phase* Overload supplied separately
Three Phase 400v up to 7.5kW with Isolator* Direct-On-Line Starter with isolator in plastic & metal enclosure IEC 947-4-1* Support for 400v 3ph or 230v single phase* Overload supplied separately
Three Phase 400v up to 7.5kW with Isolator* Direct-On-Line Starter with isolator in plastic & metal enclosure IEC 947-4-1* Support for 400v 3ph or 230v single phase* Overload supplied separately
Electrical Safety First is urging the Government to address poor quality housing after its new report concludes that one million people aged over 75 currently live in properties which fail to meet the Government’s own Decent Homes Standard.
STX France and subcontractors have ordered over 5000 km of Nexans’ Shiplink® fire resistant cables for its new ship, Oasis 3

Search by Brand